OpenClaw April 29, 2026 About 19 min v2026.4.26 migrate

2026 OpenClaw v2026.4.26
migrate, Claude import, and writable plugin roots on a VNC Mac

When migrate beats update | plan / dry-run | JSON review | Gateway checks

Data migration and configuration management

v2026.4.26 hardens the operator story for bringing outside truth into OpenClaw: the openclaw migrate path adds plannable, dry-runnable, JSON-friendly diffs and bundled flows to import prompts, MCP endpoints, and skills that lived in Claude Code or Claude Desktop, with guardrails for credentials. Rental Macs also surface OPENCLAW_PLUGIN_DIR edge cases: read-only image layers, split roots, and cold-registry drift that look like “random install failures” until you align writable dependency trees with the v2026.4.25 registry guidance. This field guide targets teams doing machine moves, org merges, or first-class imports—not a routine patch day. It pairs a decision table (update alone vs migrate), an eight-step runbook, four copy-pasteable acceptance sentences, a VNC-focused verification grid for things SSH cannot finish, and cross-links to the official Docker article, launchd automation, and the ten-fix troubleshooting index so you know which doc owns which class of break.

01

Triage: update, migrate, or both—without cargo-culting either

The fastest way to bloat a ticket is to run migrate because the version number ticked, or to run openclaw update alone when the authoritative tree is split across two laptops and a shared bucket. Update keeps a single, healthy lineage current. Migrate is for structural movement: new host, new canonical state dir, or bulk merges from another toolchain. The six bullets below are common misfires; compare to the 3.x era migration article when you need historical contrast—4.26 leans on machine-readable plans instead of a five-line checklist alone.

  1. 01

    Patch day, same node: openclaw update + openclaw doctor first; do not re-run migrate “just in case.”

  2. 02

    New node: migrate plan/dry-run so relative paths, ports, and ~/.openclaw aliases are normalized before the Gateway starts on the wrong port map.

  3. 03

    Claude workspace is the source of truth for prompts: use the 4.26 import merge, not a manual copy that leaves two divergent canons.

  4. 04

    Plugin installs fail with EROFS-style errors: fix writable roots and OPENCLAW_PLUGIN_DIR before re-running openclaw update on a half-written tree.

  5. 05

    Compose and bare metal both exist: re-read the Docker guide to avoid two Gateways fighting the same 18789 path.

  6. 06

    launchd wraps your daemon: after a migrate, re-check the plist EnvironmentVariables with the launchd article so the interactive user and the daemon user stay coherent.

02

Symptom matrix

What you seeDefault moveNext hopAvoid
Package out of date onlyupdate + doctorcache/permissionsfull migrate
Fresh host, all paths newmigrate plan + JSONdiff secretsHand-copy JSON as root
MCP/Skill list lives in Claude4.26 merge import + dry-runredact secrets in ticketsDouble bookkeeping forever
Install fails read-onlywritable dep root + repairreopen Gatewayglobal chmod 777
“Mixed” Gateway after upgradealign binary + registry4.25 repair flowRestart-only theatre
03

Eight-step runbook: version print to a Gateway you trust

Treat the steps as titles for your change request; on a rented Mac keep a VNC path open so the same interactive user that owns Gateway can also finish browser and macOS consent work.

  1. 01

    Fingerprint: capture openclaw --version and a full openclaw doctor plus release channel (stable/beta) and whether you are inside a container.

  2. 02

    Back up: claw backup or the snapshot flow your release notes mandate; for cloud hosts, snapshot the data volume too so rollback is one ticket, not archaeology.

  3. 03

    Plan: run the migrate plan subcommand to list touched paths, providers, plugins, and the secrets plane.

  4. 04

    Dry-run JSON: classify diffs: additive keys, canonical renames, and anything needing human pick-one resolution.

  5. 05

    Claude merge review: compare instruction files, MCP cards, and skill archives after redaction; if two sources disagree, state which side wins in your internal wiki, not in Slack alone.

  6. 06

    Writable root + OPENCLAW_PLUGIN_DIR: point dependency installs at a real writable location, then openclaw plugins repair and plugins doctor to align the cold registry story from 4.25.

  7. 07

    Gateway: use local loopback or your reverse proxy to 18789; verify health, websockets, and the error triage in the ten-class guide before you declare success.

  8. 08

    Freeze the CR: include dry-run versus apply diffs, rollback path, and explicit touch points with Docker or launchd owners.

illustrative
openclaw --version && openclaw doctor
claw backup
openclaw migrate <plan|dry-run per your release notes>
# review JSON, then apply
openclaw plugins repair
openclaw status
04

Quotable acceptance lines

  • Line 1: With multiple upstreams, the migrate JSON is the first audit artifact—feelings are not a substitute.
  • Line 2: OPENCLAW_PLUGIN_DIR failures classify as writability and root design, not “transient network.”
  • Line 3: Gateway sign-off must occur in the declared interactive user session; an SSH scrollback is insufficient for every consent path.
  • Line 4: 4.25 style registry health checks are a post-migrate habit, not an optional add-on the night of the merge.
05

VNC session grid (what plain SSH does not cover)

ItemIn VNCPass
Loopback / reverse proxyOpen the control UI with devtoolsStable WS, no 401 storm
System/browser consentFinish prompts in the same user that owns the Gateway processPrompts not deferred to “someone on VPN”
Sleep / powerAlign with launchd expectationsNo mid-demo nap on shared hosts
Plugin UICompare GUI list to CLI plugins listNames/versions line up
Read next

Linked guides

FAQ

Yes if single host, single canon. Machine moves and imports need plan + dry-run.

Point dependencies at a writable root, plugins repair, re-open Gateway.

Closing

Migrate is how you prove a config merge, not just hope a tarball landed intact. The hidden cost of skipping that proof is a split-brain where Gateway, launchd, and your Docker host disagree on ports and paths—tickets then oscillate between “it worked on my machine” and “it worked in SSH but not the UI,” which is expensive in calendar time and trust.

Self-hosting metal trades subscription dollars for capital, power contracts, and on-call for OS updates, while undersized laptops choke right when you parallelize imports, model pulls, and UI automation. A dedicated rentable Mac with both SSH and a reviewable GUI session keeps the boring uptime problems with the provider while you focus on the merge and security boundaries.

To stand up a node that can execute this article’s same-user VNC checks alongside CLI migrate flows, use VNCMac: the primary action below is the purchase page; for plans and public specs start from the home page and keep the Docker and launchd guides in the same run folder as this checklist.